The solar power station in the Seminsky Ski Training Center
To content

The solar power station in the Seminsky Pass training center with a capacity of 80 kW is located on the roof, on a structure that allows changing the tilting angle of the solar panels. With an installed capacity of solar modules of 78 kW6 on a clear sunny day, the peak power supplied by the station reaches 96 kW, and the daily generation exceeds 600 kWh.

Read more about this case in Neosun News.

Estimated annual generation: > 205 MWh

Equipment used:

  • Solar modules: NEOSUN™ MaxPower 360 W х 216 pcs.
  • Grid-tie inverters: GoodWe 60 kW х 2 pcs.

Project Gallery

Brief info
Location
Altai Republic, Russia
Power
80kW

Do you want the same?
Inquiry

Other projects
Submit your question