The solar power station in the Seminsky Ski Training Center
To content

The solar power station in the Seminsky Pass training center with a capacity of 80 kW is located on the roof, on a structure that allows changing the tilting angle of the solar panels. With an installed capacity of solar modules of 78 kW6 on a clear sunny day, the peak power supplied by the station reaches 96 kW, and the daily generation exceeds 600 kWh.

Read more about this case in Neosun News.

Commissioned: July 2019
Estimated annual generation: > 205 MWh

Equipment used:

  • Solar modules: NEOSUN™ MaxPower 360 W х 216 pcs.
  • Grid-tie inverters: GoodWe 60 kW х 2 pcs.