The solar power station in the Seminsky Pass training center with a capacity of 80 kW is located on the roof, on a structure that allows changing the tilting angle of the solar panels. With an installed capacity of solar modules of 78 kW6 on a clear sunny day, the peak power supplied by the station reaches 96 kW, and the daily generation exceeds 600 kWh.
Estimated annual generation: > 205 MWh
Equipment used:
- Solar modules: NEOSUN™ MaxPower 360 W х 216 pcs.
- Grid-tie inverters: GoodWe 60 kW х 2 pcs.